GEWA heat recovery systems



for the heating of heating water or drying air
best utilization of the heat recovered from the galvanizing furnace thanks to best possible adaptation to the heat requirements of the preliminary treatment baths or the drier
long life thanks to robust construction
high degree of economic efficiency and fast amortization
easy to operate and maintain thanks to apparatus with a well thought-out design

Img 1: Heat recovery plant with additional burner, pre-
assembled and ready for transport [Please click on the
image for a bigger size].


Do you want to know more...?



(C) 2005 - Alle Rechte vorbehalten

Diese Seite drucken